R1 Recovery Facility: Difference between revisions

put formula inline
No edit summary
Line 1: Line 1:
[[Category:Technologies & Solutions]][[Category:Legislation & Policy]]
[[Category:Technologies & Solutions]][[Category:Legislation & Policy]]
The R1 status of an [[Energy from Waste]] ([[EFW]]) facility determines whether that facility is regarded as [[Disposal]] or classifies it as an [[Energy Recovery Facility]]. The EU standard sets a requirement to meet high levels of power conversion efficiency to classify it as an R1 (and may need to be a CHP facility to fully meet the guidance).
The R1 status of an [[Energy from Waste]] ([[EfW]]) facility determines whether that facility is regarded as [[Disposal]] or classifies it as an [[Energy Recovery Facility]]. The EU standard sets a requirement to meet high levels of power conversion efficiency to classify it as an R1 (and may need to be a CHP facility to fully meet the guidance).


To qualify as R1 status the [[EFW]] facility must :
To qualify as R1 status the [[EfW]] facility must :
* Have or will have an [[Environmental Permit]] for a waste incineration installation
* Have or will have an [[Environmental Permit]] for a waste incineration installation
* Be capable of incinerating mixed [[Municipal Solid Waste]], including [[RDF]] or [[SRF]] [[Waste Derived Fuel]]
* Be capable of incinerating mixed [[Municipal Solid Waste]], including [[RDF]] or [[SRF]] [[Waste Derived Fuel]]