In its desire to stimulate investment in waste infrastructure, and underpin the diversion of [[BMW]] waste from [[Landfill]], the Government supported/ | In its desire to stimulate investment in waste infrastructure, and underpin the diversion of [[BMW]] waste from [[Landfill]], the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by [[Waste Disposal Authorities]] needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after [[DEFRA]] assessed <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Waste Infrastructure Delivery Programme]</ref> that the [[BMW]] targets could be met with the infrastructure funded to that date, and several are currently being considered by [[Waste Disposal Authorities]] for movement out of PFI after consideration of the cost benefit of continuing with the contract. | ||
The table below is an extract from DEFRA data <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl DEFRA Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)]</ref> | The table below is an extract from DEFRA data <ref>[https://data.gov.uk/dataset/b99f22a0-e716-44bf-bff2-a12da2562e4f/waste-infrastructure-delivery-programme-widp-residual-waste-treatment-infrastructure-project-list-ipl [[DEFRA]] Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)]</ref> summarizing the residual waste projects that are/were [[PFI]] and [[PPP]] projects: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Location !! Project/Site !! Classification !! Status !! Capacity (ktpa) !! Plant Type !! Comment | ! Location !! Project/Site !! Classification !! Status !! Capacity <ref> the capacity has been reproduced from the DEFRA data, but has not been verified in this table, an din some cases is known to be incorrect</ref> (ktpa) !! Plant Type !! Comment | ||
|- | |- | ||
| Avonmouth | | Avonmouth || New Earth Solutions || [[PPP]] || Operational || 372 || [[MBT]] || Bought out of administration by [[Beauparc]],currently services [[West of England]], contracts lost to [[Suez]] and [[Viridor]] from 2022 | ||
|- | |- | ||
| | | Avonmouth || New Earth Energy || [[PPP]] || Mothballed || 73 || [[EfW]] || [[RDF]] from Avonmouth MBT fed this plant, technology failed, currently mothballed | ||
|- | |- | ||
| | | Basingstoke || [[Chineham]] ([[Project Integra]]) || [[PPP]] || Operational || 99 || EfW || [[Veolia]] site for [[Hampshire County Council]] | ||
|- | |- | ||
| | | Birmingham || [[Landor Street]] || [[PPP]] || Operational || 165 || MBT || Example | ||
|- | |- | ||
| | | Birmingham || [[Tyseley]] || [[PPP]] || Operational || 361 || [[EfW]] || [[Veolia]] site towards its end of life | ||
|- | |- | ||
| | | Bolton|| [[Raikes Lane]] || [[PFI]] || Operational || 86 || [[EfW]] || Example | ||
|- | |- | ||
| | | Buckinghamshire || [[Greatmoor]] || [[PPP]] || Operational || 300 || [[EfW]] || [[FCC]] site | ||
|- | |- | ||
| | | Cambridgeshire || [[Waterbeach]] || [[PFI]] || Operational || 200 || [[MBT]] || [[Amey Cespa]] site with variable performance reported, planning being pursued for new [[EfW]] on the site | ||
|- | |- | ||
| | | Cornwall || [[St. Dennis]] || [[PFI]] || Operational || 240 || [[EfW]] || [[Suez]] site | ||
|- | |- | ||
| | | Coventry || [[Coventry EFW]] || [[PPP]] || Operational || 245 || [[EfW]] || Example | ||
|- | |- | ||
| | | Cumbria || [[Hespin Wood]] || [[PPP]] || Mothballed|| 66 || [[MBT]] || Example | ||
|- | |- | ||
| | | Cumbria || [[Barrow-in-Furness]]|| [[PPP]] || Mothballed || 50 || [[MBT]] || Example | ||
|- | |- | ||
| | | Derbyshire || [[Sinfin Lane]] || [[PPP]] || In Construction || 190 || [[EfW]] || Recent termination of contract after delays in commissioning | ||
|- | |- | ||
| | | Dudley || [[Lister Road]] || [[PPP]] || Operational || 93 || [[EfW]] || Example | ||
|- | |- | ||
| | | [[ELWA]] 1 || [[Frog Island]] || [[PFI]] || Operational || 180 || [[MBT]] || [[Renewi]] site servicing [[ELWA]], recently reported financial difficulty | ||
|- | |- | ||
| | | [[ELWA]] 2 || [[Jenkins Lane]] || [[PFI]] || Operational || 180 || [[MBT]] || As per [[ELWA]] 1 | ||
|- | |- | ||
| | | East Sussex || [[Newhaven]] || [[PFI]] || Operational || 234 || [[EfW]] || Servicing [[East Sussex County Council]] and [[Brighton and Hove City Council]] | ||
|- | |- | ||
| | | Essex || [[Courtauld Road]] || [[PFI]] || Operational || 417 || [[MBT]] || Servicing [[Essex County Council]] and [[Southend-on-Sea Council]], reported operational difficulties | ||
|- | |- | ||
| | | Exeter || [[Marsh Barton]] || [[PPP]] || Operational || 60 || [[EfW]] || [[Viridor]] site | ||
|- | |- | ||
| | | Ferrybridge || [[Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || Example | ||
|- | |- | ||
| | | Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational || 190 || [[EfW]] || Example | ||
|- | |- | ||
| | | Greater Manchester || [[Longley Lane]] || [[PFI]] || Mothballed || 110 || [[MBT]] || Example | ||
|- | |- | ||
| | | Greater Manchester || [[Runcorn Phase 1]] || [[PFI]] || Operational || 325 || [[EfW]] || Example | ||
|- | |- | ||
| | | Greater Manchester || [[N. Manchester]] || [[PFI]] || Mothballed || 65 || [[MBT]] || Example | ||
|- | |- | ||
| | | Greater Manchester || [[Oldham]] || [[PFI]] || Mothballed || 99|| [[MBT]] || Example | ||
|- | |- | ||
| | | Greater Manchester || [[Salford]] || [[PFI]] || Mothballed || 73 || [[MBT]] || Example | ||
|- | |- | ||
| | | Greater Manchester || [[Stockport]] || [[PFI]] || Mothballed || 92 || [[MBT]] || Example | ||
|- | |- | ||
| | | Hartlepool || [[Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Example | ||
|- | |- | ||
| | | Herefordshire || [[Hartlebury]] || [[PPP]] || In Construction || 200 || [[EfW]] || Example | ||
|- | |- | ||
| | | Hertfordshire || [[Hoddesdon]] || [[PPP]] || Post Close || 320 || [[EfW]] || Example | ||
|- | |- | ||
| | | Isle of Wight || [[Isle of Wight [[Gasification]]]] || [[PPP]] ||In Construction || 40 || [[EfW]] || Example | ||
|- | |- | ||
| Example || Example || Example || Example || Example || Example || Example | | Example || Example || Example || Example || Example || Example || Example | ||
| Line 156: | Line 154: | ||
| Example || Example || Example || Example || Example || Example || Example | | Example || Example || Example || Example || Example || Example || Example | ||
|- | |- | ||
} | |||