Trident Park (Cardiff ERF): Difference between revisions
m add page specific text |
m Update links |
||
Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
[[File:Viridor Trident Park.png|400px|left]] | [[File:Viridor Trident Park.png|400px|left]] | ||
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/ | An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref> | ||