Trident Park (Cardiff ERF): Difference between revisions

Bin52 (talk | contribs)
m add page specific text
Bin52 (talk | contribs)
m Update links
Line 4: Line 4:
==Summary==
==Summary==
[[File:Viridor Trident Park.png|400px|left]]
[[File:Viridor Trident Park.png|400px|left]]
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref>
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/cardiff-erf/ Viridor Website]</ref>