The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the [[PFI]] for [[Greater Manchester Combined Authority | GMWDA]] and was then subsequently extended to deliver a capacity of 1,100,000 tonnes per annum to reflect the lower [[Calorific Value]] of the fuel delivered than was anticipated in the design for 850,000 tonnes per annum. The facility is a [[CHP]] plant, located on [[Ineous Chlor]]'s site in Runcorn, generating 83MWe of electricity (design point vs 100MWe listed capacity) and 51MWth of heat for the adjacent chemical manufacturing site | The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the [[PFI]] for [[Greater Manchester Combined Authority | GMWDA]] and was then subsequently extended to deliver a capacity of 1,100,000 tonnes per annum to reflect the lower [[Calorific Value]] of the fuel delivered than was anticipated in the design for 850,000 tonnes per annum. The facility is a [[CHP]] plant, located on [[Ineous Chlor]]'s site in Runcorn, generating 83MWe of electricity (design point vs 100MWe listed capacity) and 51MWth of heat for the adjacent chemical manufacturing site | ||
==Plant== | ==Plant== | ||
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid= | Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>. | ||
The plant comprises 4 lines (2 in each phase) of standard combustion technology generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg | The plant comprises 4 lines (2 in each phase) of standard combustion technology generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg | ||
Revision as of 18:24, 3 February 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
One of the largest ERF facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by Viridor and owned by Viridor and Ineous Chlor. Delivery of waste is by both road and rail and the facility processes both residual Household Waste and Commercial Waste in the form of RDF[1]
History
The Runcorn facility was built in two phases with 425,000 tonnes per annum capacity in each phase. The initial capacity focused on the solution delivered as part of the PFI for GMWDA and was then subsequently extended to deliver a capacity of 1,100,000 tonnes per annum to reflect the lower Calorific Value of the fuel delivered than was anticipated in the design for 850,000 tonnes per annum. The facility is a CHP plant, located on Ineous Chlor's site in Runcorn, generating 83MWe of electricity (design point vs 100MWe listed capacity) and 51MWth of heat for the adjacent chemical manufacturing site
Plant
Built by Keppel Seghers under a Design & Build EPC-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million [2]. The plant comprises 4 lines (2 in each phase) of standard combustion technology generating super-heated steam, and is configured to run on RDF with a 'design point' CV of 11.5MJ/kg