Exeter Energy Recovery Facility: Difference between revisions
m expanded text |
m expanded text |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref> | An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]] for the first 5 years of its life. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref>. | ||
==History== | ==History== | ||
The Exeter facility was built primarily to service a | The Exeter facility was built primarily to service a [[PPP]] contract with [[Devon County Council|Devon]], servicing primarily [[Exeter City Council]] with anticipated total throughput of up to 60,000 tonnes per annum. | ||
==Plant== | ==Plant== | ||