Exeter Energy Recovery Facility: Difference between revisions

Bin52 (talk | contribs)
m expanded text
Bin52 (talk | contribs)
m expanded text
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref>
An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Exeter has permitted operational capacity of 60,000 tonnes per annum, owned by [[Viridor]] and operated for them by [[Cyclerval]] for the first 5 years of its life. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/exeter-erf/ Viridor Website]</ref>.


==History==
==History==
The Exeter facility was built primarily to service a 25 year [[PPP]] contract signed in March 2011 with [[Devon County Council|Devon]], servicing primarily [[Exeter City Council]] with anticipated total throughput of up to 60,000 tonnes per annum.  
The Exeter facility was built primarily to service a [[PPP]] contract with [[Devon County Council|Devon]], servicing primarily [[Exeter City Council]] with anticipated total throughput of up to 60,000 tonnes per annum.  


==Plant==
==Plant==