Peterborough EfW: Difference between revisions
m add page specific text |
m minor text changes |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology which as | An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Peterborough has permitted operational capacity of 300,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/peterborough-erf/ Viridor Website]</ref> mainly in the form of a prepared [[RDF]] | ||
==History== | ==History== | ||