Peterborough EfW: Difference between revisions
m expanded text |
m →Plant |
||
| Line 11: | Line 11: | ||
==Plant== | ==Plant== | ||
Built by a JV between [[Interserve]] and [[Babcox & Wilcox Volund A/S]] as a turnkey [[EPC]] contract, which started in summer 2013 and was delivered in December 2015 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Website]</ref> £74m capital cost. | Built by a JV between [[Interserve]] and [[Babcox & Wilcox Volund A/S]] as a turnkey [[EPC]] contract, which started in summer 2013 and was delivered in December 2015 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Website]</ref> £74m capital cost. | ||
The plant comprises | The plant comprises one line via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 85,000 tonnes per annum and generating 7.25MWe based on [[CV]] of 9MJ/kg <ref>[http://www.volund.dk/Waste_to_Energy/References/Peterborough_UK Volund Website]</ref>. | ||
==Local Authority Users== | ==Local Authority Users== | ||