Exeter Energy Recovery Facility: Difference between revisions
m expanded text |
m →Plant |
||
| Line 11: | Line 11: | ||
==Plant== | ==Plant== | ||
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in July 2014 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £47m capital cost. | Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in July 2014 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £47m capital cost. | ||
The plant comprises | The plant comprises one line with design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe, but electrical capacity is shown as 13MWe. | ||
==Local Authority Users== | ==Local Authority Users== | ||