Exeter Energy Recovery Facility: Difference between revisions

Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
Line 11: Line 11:
==Plant==
==Plant==
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in July 2014 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £47m capital cost.
Built by [[TIRU SA]] (now part of [[Dalkia]]<ref>[https://www.dalkiawastenergy.com/history-tiru Dalkia Waste Energy Website]</ref>, part of the [[EDF Group]]) under a Design & Build [[EPC]]-turnkey contract which was delivered and operational in July 2014 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £47m capital cost.
The plant comprises one line with design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe, but electrical capacity is shown as 13MWe.
The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe, but electrical capacity is shown as 13MWe.


==Local Authority Users==
==Local Authority Users==