Severnside Energy Recovery Centre: Difference between revisions

Bin52 (talk | contribs)
m add page specific text
Bin52 (talk | contribs)
m expanded text
Line 1: Line 1:
[[File:Suez Severside.png|350px|left|Suez Severnside (SERC)  Site]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=ZP3937KL|id=12}}
{{EfWTemplate|EPR=ZP3937KL|id=12}}


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Wilton 11 has a permitted operational capacity of 444,000 tonnes per annum, and is owned by a joint venture between [[Suez]] and [[Sembcorp]] and operated by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.sembcorp.co.uk/our-services/our-services/energy/ Sembcorp Website]</ref>.
An [[EfW]] facility based upon conventional combustion technology and considered an [[ERF]] based on its [[R1]] status. Severnside ERC (also known as SERC) has a permitted operational capacity of 400,000 tonnes per annum, and is owned and operated by [[West London Energy Recovery Ltd]] a company set up for the purpose by [[Suez]]. Delivery of waste is primarily by rail and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].  


==History==
==History==
The Wilton 11 facility was built primarily to service a 30 year [[PPP]] contract signed in April 2013 with [[Mersyside Waste Disposal Authority| Merseyside]] <ref>[https://www.power-technology.com/projects/teesside-energy-from-waste-efw-facility/ Power Technology Website]</ref>, with anticipated input of 440,000 tonnes per annum i.e the majority of the tonnage. [[Residual Waste]] is loaded at [[Knowsley Rail Transfer Station]] prior to its transport to Wilton 11. It was formally opened in June 2018 <ref>[https://www.letsrecycle.com/news/latest-news/suez-wilton-efw-opened/ Letsrecycle Article]</ref>. It is located in Teeside on the Wilton International Industrial Estate and is discrete from [[Wilton 10]] which is a [[Biomass Waste EFW]] project.
The Riverside ERC was built primarily to service a 25 year [[PPP]] contract signed in 2013 with [[West London Waste Disposal Authority| WLWA]] <ref>[https://www.letsrecycle.com/news/latest-news/suez-milestone-severnside-erf/ Letsrecycle Article]</ref>, with anticipated input of around 300,000 tonnes per annum i.e the majority of the tonnage. Additional tonnage has also been secured from the [[West of England Partnership]] and [[Devon County Council]].The [[Residual Waste]] from [[West London Waste Disposal Authority| WLWA]] is loaded at two rail-linked transfer stations in Brentford and South Ruislip  prior to its transport to Severnside ERC. A recent application was made to extend the permitted capacity at the site to 500,000 tonnes per annum.  


==Plant==
==Plant==
Built by [[CNIM]] and [[Clugson]] construction started in 2014 and was completed in 2016 at a reported £250m capital cost, generating 49 MWe and steam for the adjacent [[Sembcorp]] site, although the listing does not show it to be a [[CHP]] plant<ref>[https://www.gazettelive.co.uk/business/business-news/wilton-11-work-250m-create-7967920 Local Press Article]</ref>. The finance and delivery was under a build, own, operate and transfer contract with [[Mersyside Waste Disposal Authority| Merseyside]].
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract and was delivered in 2016 at a GBP £240m capital cost.
The plant comprises 2 lines of 21.85 tonnes/hour (maximum 24.24 tonnes/hour) design capacity capable of treating 350,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam. It is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 7.5 and 12.5MJ/kg to deliver 37.5MWe of power <ref>[http://www.hz-inova.com/cms/wp-content/uploads/2016/10/Severnside_Online_E.pdf Hitachi Zosen Inova Website]</ref>. Operating at the maximum design tonnes/ hour figure would result in a capacity close to 400,000 tonnes per annum, but this would require a low [[CV]].


==Local Authority Users==
==Local Authority Users==