Beddington EfW: Difference between revisions
m →Plant: Typo |
m →Summary: Tonnage change |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Beddington has permitted operational capacity of | An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Beddington has permitted operational capacity of 303,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/beddington-erf/ Viridor Website]</ref> | ||
==History== | ==History== | ||