Public Private Partnership: Difference between revisions

Bin52 (talk | contribs)
m Update links
Bin52 (talk | contribs)
m Update links
Line 41: Line 41:
| Ferrybridge || [[Ferrybridge Multifuel 1 (FM1) | Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || Joint Venture between [[Wheelabrator]] and [[SSE]], includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities
| Ferrybridge || [[Ferrybridge Multifuel 1 (FM1) | Multifuel 1]] (FM1) || [[PPP]] || Operational || 400 || [[EfW]] || Joint Venture between [[Wheelabrator]] and [[SSE]], includes [[Cumbria County Council | Cumbria]] via their contract with [[Renewi]] for [[RDF]] from their [[MBT]] facilities
|-
|-
| Gloucestershire || [[Javelin Park]] || [[PPP]] || Operational<ref name="op">In original data site was listed as In Construction this has been changed to Operational.</ref>|| 190 || [[EfW]] || Delivery by partners [[Urbaser Balfour Beatty]] primarily serving [[Gloucestershire County Council | Gloucestershire]]
| Gloucestershire || [[Javelin Park EfW|Javelin Park]] || [[PPP]] || Operational<ref name="op">In original data site was listed as In Construction this has been changed to Operational.</ref>|| 190 || [[EfW]] || Delivery by partners [[Urbaser Balfour Beatty]] primarily serving [[Gloucestershire County Council | Gloucestershire]]
|-
|-
| Hartlepool || [[Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3 | Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Operated by [[Suez]] receiving [[Residual Waste | waste]] from several local authorities in the North-East, primarily for [[Northumberland Council | Northumberland]]
| Hartlepool || [[Teeside EfW - lines 1-5 (Teeside & NEERC), Billingham. line 3 | Tees Valley Lines 1 &2]] || [[PPP]] || Operational || 345 || [[EfW]] || Operated by [[Suez]] receiving [[Residual Waste | waste]] from several local authorities in the North-East, primarily for [[Northumberland Council | Northumberland]]
Line 49: Line 49:
| Hertfordshire || [[Hoddesdon]] || [[PPP]] || Terminated <ref> The project was called in at a very late stage by the secretary of state and refused planning consent after strong local opposition, leading to the termination of the long term residual waste contract between [[Hertfordshire County Council | Hertfordshire]] and [[Veolia]] reported in Aug 2019</ref> || 320 || [[EfW]] || Long term contract with [[Hertfordshire County Council | Hertfordshire]] terminated
| Hertfordshire || [[Hoddesdon]] || [[PPP]] || Terminated <ref> The project was called in at a very late stage by the secretary of state and refused planning consent after strong local opposition, leading to the termination of the long term residual waste contract between [[Hertfordshire County Council | Hertfordshire]] and [[Veolia]] reported in Aug 2019</ref> || 320 || [[EfW]] || Long term contract with [[Hertfordshire County Council | Hertfordshire]] terminated
|-
|-
| Isle of Wight || [[Isle of Wight]] [[Gasification]] || [[PPP]] ||In Construction || 40 || [[EfW]] || Development between [[Amey]] and [[Isle of Wight Council]], delays in commissioning reported to early 2020
| Isle of Wight || [[Isle of Wight Waste Recovery Park|Isle of Wight]] [[Gasification]] || [[PPP]] ||In Construction || 40 || [[EfW]] || Development between [[Amey]] and [[Isle of Wight Council]], delays in commissioning reported to early 2020
|-
|-
| Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational  ||80 || [[MBT]] || Development between [[Amey]] and [[Isle of Wight Council]]
| Isle of Wight || [[Isle of Wight WM Project]] || [[PPP]] ||Operational  ||80 || [[MBT]] || Development between [[Amey]] and [[Isle of Wight Council]]