EnviRecover - Hartlebury EFW: Difference between revisions
Imported from text file |
m add page specific text |
||
Line 1: | Line 1: | ||
[[File:Mercia Hartlebury.png|400px|left|Mercia Hartlebury]] | |||
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | ||
{{EfWTemplate|EPR=XP3935TX|id=26}} | {{EfWTemplate|EPR=XP3935TX|id=26}} | ||
==Summary== | ==Summary== | ||
Owned and operated by [[Mercia Waste Management Ltd]], a 50:50 joint venture between [[FCC Environment]] and [[Urbaser]] | |||
==History== | ==History== | ||
[[PFI]] signed in 1998 between and [[Herefordshire Council| Herefordshire]] and [[Worcestershire County Council|Worcestershire]] | |||
==Plant== | ==Plant== | ||
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction was completed in 2017 at a reported<ref>[http://www.hz-inova.com/cms/wp-content/uploads/2015/08/H_W_online_E.pdf Hitachi Zosen Inova Website]</ref> GBP £125m capital cost. | |||
The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power. | |||
==Local Authority Users== | ==Local Authority Users== |
Revision as of 18:49, 5 February 2020
EnviRecover - Hartlebury EFW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | XP3935TX |
Operator | Severn Waste Services Ltd |
Region | West Midlands |
Operational Capacity | 230ktpa |
Is site R1? | fal |
When was R1 Granted? | 2017-10-03 |
What was the R1 value | 0.75 |
Electrical Capacity | 22.00MWe |
Number of Lines | 1 |
Number of Turbines | 1 |
CHP | No |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 161795.00 | 38267.00 | 0.00 | 0.00 | 200062.00 |
2019 | 169615.00 | 43890.00 | 0.00 | 0.00 | 213505.00 |
2020 | 176156.00 | 39608.00 | 0.00 | 0.00 | 215764.00 |
2021 | 168220.00 | 51182.00 | 4.20 | 0.00 | 219406.20 |
2022 | 173377.00 | 36857.00 | 0.00 | 0.00 | 210234.00 |
2023 | 178333.00 | 32950.00 | 0.00 | 0.00 | 211283.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 38733.00 | 0.00% | 5515.00 | 0.00% |
2018 | 43648.00 | 21.82% | 6562.00 | 3.28% |
2019 | 41849.00 | 19.60% | 6519.00 | 3.05% |
2020 | 44768.00 | 20.75% | 6313.00 | 2.93% |
2021 | 43704.00 | 19.92% | 6186.00 | 2.82% |
2022 | 41707.00 | 19.84% | 5746.00 | 2.73% |
2023 | 41317.00 | 19.56% | 6411.00 | 3.03% |
Summary
Owned and operated by Mercia Waste Management Ltd, a 50:50 joint venture between FCC Environment and Urbaser
History
PFI signed in 1998 between and Herefordshire and Worcestershire
Plant
Built by Hitachi Zosen Inova under a Design & Build EPC-turnkey contract . Construction was completed in 2017 at a reported[1] GBP £125m capital cost. The plant comprises 1 line of 26 tonnes/hour (maximum 30.5 tonnes/hour) with a design capacity capable of treating 200,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual Household Waste and Commercial Waste with a CV of between 6.8 and 12.0 MJ/kg delivering 18 MWe of power.