==Plant==
==Plant==
The plant generates 10.5 MWe of electrical output with 8.3 MWe exported to the National Grid.


==Local Authority Users==
==Local Authority Users==

Revision as of 13:32, 6 February 2020


Baldovie and Dundee EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence PPC/A/1003157
Operator MVV Environmental Baldovie Ltd
Region Scotland
Operational Capacity 260ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 20.00MWe
Number of Lines 3
Number of Turbines 2
CHP No
Technology Approach EfW
Funding Type PFI

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 98303.00 0.00 0.00 0.00 98303.00
2020 0.00 0.00 0.00 98303.00 98303.00
2021 78109.00 85090.00 0.00 0.00 163203.00
2022 73085.00 109074.00 0.00 0.00 182165.00
2023 102458.00 85457.00 0.00 0.00 187915.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 14991.00 15.25% 8224.00 8.37%
2020 13262.00 13.49% 7053.00 7.17%
2021 30039.00 18.41% 9632.00 5.90%
2022 33863.00 18.59% 9299.00 5.10%
2023 37408.00 19.91% 6465.00 3.44%

Summary

In Nov 2017, MVV entered into a contract with Dundee City Council and Angus Council to take over and operate this existing energy from waste facility whilst buiding a new, modern facility next door Dundee EfW CHP Facility.[1].

The site receives 120,000 tonnes of waste a year collected from Dundee, Angus and Aberdeenshire Council areas. The facility primarily accepts Municipal Waste and Household Waste but does allow some Commercial Waste to be treated.

The plant is due to close when the new facility Dundee EfW CHP Facility becomes fully operational.

History

The EFW plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.[2]

Plant

The plant generates 10.5 MWe of electrical output with 8.3 MWe exported to the National Grid.

Local Authority Users

References