Coventry EfW Plant: Difference between revisions

Bin52 (talk | contribs)
mNo edit summary
Bin52 (talk | contribs)
m expanded text and link
Line 7: Line 7:


==History==
==History==
The Coventry facility was built to primarily service residual [[Household Waste]] from [[Coventry City Council]] under a long term [[PPP]] which lists tonnage at 245,000 tonnes per annum.  
The Coventry facility was built to primarily service residual [[Household Waste]] from [[Coventry City Council]] under a long term [[PPP]] which lists tonnage at 245,000 tonnes per annum. The plant was re-furbished in 2012/203 by [[Martin Biopower]] to create a design capacity of 315,000 tonnes per annum<ref>[http://www.martinbiopower.com/projects/case-studies/coventry-successful-transition-through-technology-change/ Martin Biopower Website]</ref>


==Plant==
==Plant==
The plant comprises standard combustion, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]]. The plant provides 12,000MWhth of heat to users in Coventry City Centre<ref>[https://www.cswdc.co.uk/ CASWDC Website]</ref>.
The plant comprises standard combustion over 3 lines, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]]. The plant provides 12,000MWhth of heat to users in Coventry City Centre<ref>[https://www.cswdc.co.uk/ CASWDC Website]</ref>.


==Local Authority Users==
==Local Authority Users==