Vine Street EfW (Kirklees EfW): Difference between revisions
m minor text changes |
m →Plant |
||
| Line 11: | Line 11: | ||
==Plant== | ==Plant== | ||
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EfW]]. The facility commenced operation in 2002. | The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EfW]]. The facility commenced operation in 2002. | ||
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] | The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>. | ||
==Local Authority Users== | ==Local Authority Users== | ||