Vine Street EfW (Kirklees EfW): Difference between revisions

Bin52 (talk | contribs)
m minor text changes
Northern Chick (talk | contribs)
Line 11: Line 11:
==Plant==
==Plant==
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EfW]]. The facility commenced operation in 2002.
The plant is assumed to have been built by [[Lentjes]] (renamed [[Lurgi]] in 2006 and sold to [[A-Tec Industries AG]] in 2007) under a turnkey contract with a similar approach to [[Allington EfW]]. The facility commenced operation in 2002.
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]). The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>.  
The plant is 1 line with a design capacity capable of 17 tonnes/hour equivalent to around 139,000 tonnes per annum. Electricity is generated via standard combustion technology, utiliziing fluidised bed technology ROWITEC, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]]. The technology is understood to be capable of operating in a range of [[CV]] of between 6.5 and 30.0 MJ/kg depending on configuration<ref>[https://mafiadoc.com/rowitec-fluidized-bed_5a2b2dad1723dd3d745e24de.html/ Lentjes Website]</ref>.


==Local Authority Users==
==Local Authority Users==