Hooton Bio Power: Difference between revisions
Fixed |
m links |
||
| Line 6: | Line 6: | ||
==Summary== | ==Summary== | ||
Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilise Advanced Combustion Technologies to process 240,000 tonnes of MSW (Municipal Solid Waste) per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by [[CoGen]] with [[BWSC]] as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva investors<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020].]</ref>. | Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilise [[Advanced Combustion Technologies]] to process 240,000 tonnes of MSW ([[Municipal Solid Waste]]) per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by [[CoGen]] with [[BWSC]] as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva investors<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — CoGen. Online. CoGen. [Accessed 14 Feb. 2020].]</ref>. | ||
==History== | ==History== | ||
| Line 12: | Line 12: | ||
==Plant== | ==Plant== | ||
The facility will utilise 2 lines of a fluidised bed gasification system provided by [[Kobelco Eco Solutions]]. [[CoGen]] will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)<ref name="ref1" />. | The facility will utilise 2 lines of a fluidised bed [[gasification]] system provided by [[Kobelco Eco Solutions]]. [[CoGen]] will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)<ref name="ref1" />. | ||
The waste aggregator N+P will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement<ref name="ref1" />. | The waste aggregator [[N+P]] will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement<ref name="ref1" />. | ||
The Hooton Bio Power facility will be the first non-subsidised merchant gasification facility in the UK, and the largest gasification facility in the UK of its size and technology type<ref name="ref3" >BWSC, 2018. [https://www.bwsc.com/media/press-releases/2018/award-hooton BWSC awarded deal to deliver UKs largest gasification plant – Hooton Bio Power Resource Recovery Centre Project. Online. Bwsc.com. [Accessed 14 Feb. 2020].]</ref>. | The Hooton Bio Power facility will be the first non-subsidised merchant gasification facility in the UK, and the largest gasification facility in the UK of its size and technology type<ref name="ref3" >BWSC, 2018. [https://www.bwsc.com/media/press-releases/2018/award-hooton BWSC awarded deal to deliver UKs largest gasification plant – Hooton Bio Power Resource Recovery Centre Project. Online. Bwsc.com. [Accessed 14 Feb. 2020].]</ref>. | ||