Energy Works (Hull): Difference between revisions
m add picture and link |
m add page specific text |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by [[Bioenergy Investment Group]]. | |||
== | ==Technology== | ||
The plant is a single line, fluidised bed Gasification plant by [[Outotec]], generating super-heated steam. | |||
== | ==Construction== | ||
The plant commenced construction in January 2016 under a turnkey [[EPC]] contract with [[MW High Tech Projects UK]]. As a result of ongoing delays, the developer terminated the contract and contracted [[Black and Veatch]] to complete the works, which are now understood to be in advanced commissioning<ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>. | |||
==Waste Input== | ==Waste Input== | ||
The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with some preparation on site. The majority of supply has been underpinned by a contract with [[Geminor]] who will aggregate tonnage, including that from [[Hull City Council]]<ref>[https://www.letsrecycle.com/news/latest-news/geminor-major-contract-hull-council/ Letsrecycle Article]</ref>. | |||
==References== | ==References== | ||