Rookery Pit Energy Recovery Facility (Rookery South): Difference between revisions

Bin52 (talk | contribs)
add page specific text
Bin52 (talk | contribs)
m add picture and link
Line 1: Line 1:
[[File:Rookery.png|300px|left|Image of Rookery Pit ERF]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=Tbc#03|id=47}}
{{EfWTemplate|EPR=Tbc#03|id=47}}


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Lostock has an operational capacity of 545,000 tonnes per annum. The project is being developed by [[Covanta]] and is owned by [[Covanta]] (80%), [[Veolia]] (20%) and [[Covanta]] and [[Green Investment Group]] (80%).
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Lostock has a permitted capacity of 585,000 tonnes per annum. The project is being developed by [[Covanta]] and is owned by [[Covanta]] (80%), [[Veolia]] (20%) and [[Covanta]] and [[Green Investment Group]] (80%).


==Technology==
==Technology==
The plant technology will comprise standard moving grate technology, producing super-heated steam and 60MWe <ref>[https://www.rookerysouth.co.uk/ Covanta Website]</ref>.
The plant technology will comprise standard moving grate technology, producing super-heated steam with an operational capacity of 545,000 tonnes per annum, generating and 60MWe <ref>[https://www.rookerysouth.co.uk/ Covanta Website]</ref>.


==Construction==
==Construction==
The plant gained planning consent in 2013, reached financial close in March 2019, and will delivered by an [[EPC]] turnkey arrangement with [[Hitachi Zosen Inova]]. An operational date is programmed for 2022 after a lengthy legal challenge to the development came to an end in November 2019 focused on the issue of an [[Environmental Permit]], which <ref>[https://www.letsrecycle.com/news/latest-news/court-rejects-rookery-pit-appeal/ Lets Recycle Article]</ref>.
The plant gained planning consent in 2013, reached financial close in March 2019, and will delivered by an [[EPC]] turnkey arrangement with [[Hitachi Zosen Inova]]. An operational date is programmed for 2022 after a lengthy legal challenge to the development came to an end in November 2019 focused on the issue of the [[Environmental Permit]] <ref>[https://www.letsrecycle.com/news/latest-news/court-rejects-rookery-pit-appeal/ Letsrecycle Article]</ref>.