Coatbridge Renewable Energy Facility: Difference between revisions

From Wikiwaste
Imported from text file
 
Bin52 (talk | contribs)
add page specific text
Line 1: Line 1:
[[File:Coatbridge.png|400px|left|Elevation of Coatbridge MRF and EfW Facility from their website]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=Tbc#13|id=60}}
{{EfWTemplate|EPR=Tbc#13|id=60}}


==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. Shore Energy envisaged an [[RDF]] production facility adjacent to the [[EfW]] facility on the site.


==History==
==Technology==
The plant was based on [[Chinook]]'s [[RODECS]] [[Gasification]] technology


==Plant==
==Construction==
There is no information on the current status of funding or construction of the project in the public domain, with the most recent project news requesting residual waste for the opening of the plant from 2017, posted in 2015<ref>[http://www.shore-energy.co.uk/ Shore Energy Website]</ref>


==Local Authority Users==
==Waste Input==
The overall facility was designed to run on 160,000 tonnes per annum, with [[EfW]] facility designed to run on [[RDF]] and [[SRF]] delivered as prepared fuel, or prepared in the adjacent fuel processing facility.


==References==
==References==
<references />
<references />

Revision as of 09:59, 18 February 2020

Elevation of Coatbridge MRF and EfW Facility from their website
Elevation of Coatbridge MRF and EfW Facility from their website


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology. Shore Energy envisaged an RDF production facility adjacent to the EfW facility on the site.

Technology

The plant was based on Chinook's RODECS Gasification technology

Construction

There is no information on the current status of funding or construction of the project in the public domain, with the most recent project news requesting residual waste for the opening of the plant from 2017, posted in 2015[1]

Waste Input

The overall facility was designed to run on 160,000 tonnes per annum, with EfW facility designed to run on RDF and SRF delivered as prepared fuel, or prepared in the adjacent fuel processing facility.

References