Bulwell Energy: Difference between revisions
Arctellion (talk | contribs) No edit summary |
add page specific text |
||
| Line 3: | Line 3: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. [[Bulwell Energy Ltd]] is a subsidiary of [[Chinook]] and the site is geographically close to the demonstration plant they have in Nottingham. Whilst an Environmental Permit was issued in late 2018 <ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/749091/Partial_Surrender_Notice.pdf Gov.uk Website]</ref> no construction is understood to have commenced. | |||
== | ==Technology== | ||
The plant was based on [[Chinook]]'s [[RODECS]] [[Gasification]] technology. | |||
== | ==Construction== | ||
There is no information on the current status of funding or construction of the project in the public domain, with the most recent project news only discussing the commercialisation of the demonstration plant to produce activated carbon in March 2019<ref>[http://www.chinooksciences.com/news/#.XkwlK9hzzIU Chinook Website]</ref> | |||
== | ==Waste Input== | ||
The overall facility was designed to run on 160,000 tonnes per annum of [[RDF]]. | |||