Belfast Harbour Estate: Difference between revisions
Imported from text file |
add page specific text |
||
| Line 1: | Line 1: | ||
[[File:Belfast.png|400px|left|Artist Impression of Belfast EFW]] | |||
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | ||
{{EfWTemplate|EPR=Tbc#14|id=61}} | {{EfWTemplate|EPR=Tbc#14|id=61}} | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. The Belfast Harbour site, also known as the Bombardier site due to its proximity to this business, is being delivered by a joint venture known as [[Full Circle Generation]] (including [[River Ridge Energy Ltd]], [[Green Investment Bank]], [[Equitix]], and [[P3P Partners]]). The plant is listed as being able to process 120,000 tonnes per year, but is also reported as being capable of processing 180,000 tonnes per year<ref>[https://www.letsrecycle.com/news/latest-news/gib-commits-47m-to-belfast-efw-facility/ Letsrecycle Article]</ref>. | |||
== | ==Technology== | ||
The plant is a 3 line, grate based technology by [[Biomass Power Limited]], generating steam to turbines delivering 14.85MWe<ref>[https://riverridge.co.uk/app/uploads/2017/03/FCG.pdf RiverRidge Website/Full Circle Generation Brochure]</ref>. | |||
== | ==Construction== | ||
The plant is being constructed under a turnkey [[EPC]] arrangement at a capital cost of GBP £107m by [[Bouygues Energy Services]] who will also operate and maintain the plant for 17 years<ref>[https://www.theconstructionindex.co.uk/news/view/bouygues-signs-146m-contract-for-belfast-waste-plant The Construction Index Article]</ref>. | |||
== | ==Waste Input== | ||
The plant is designed to run on 120,000 tonnes per year of prepared [[RDF]] from offsite company [[Pioneer Fuels]]. | |||
==References== | ==References== | ||
<references /> | <references /> | ||