Earls Gate Energy Centre
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecast to have a maximum capacity of 215,000 tonnes per annum, and will be a Combined Heat and Power facility, exporting 21.5 MW electricity and heat to the nearby chemical company CalaChem and to other adjacent industrial plants, with any excess power fed into the national grid. The cost of the project is circa £200m, which was provided by the investors Brockwell Energy, the Green Investment Group and Covanta. The facility has been developed by Brockwell Energy, and will be operated by MES Environmental, a subsidiary of CNIM, for a contract duration of 25 years.
The EfW will replace an existing gas-fired energy plant on the site.
It is expected for the facility to become operational by the end of 2021[2].
Technology
The moving-grate combustion technology will be provided by CNIM[3].
Construction
CNIM is the EPC contractor for this facility, with Clugston in charge of the civil engineering. Construction commenced in January 2019 and is scheduled to take 3 years, with commissioning ending and operations beginning in 2021[2].
Waste Input
The facility will accept residual waste as feedstock.
References
- ↑ Biothek Ecologic Fuel, 2018. Energy from waste CHP plant to power Scottish industries - Biothek Ecologic Fuel. Online. Biothek Ecologic Fuel. [Accessed 21 Feb. 2020.]
- ↑ 2.0 2.1 Earls Gate Energy Centre, 2020. Home - EARLS GATE ENERGY CENTRE. Online. [Accessed 21 Feb. 2020.]
- ↑ Brockwell Energy, 2020. Brockwell Energy | Earls Gate Energy Centre. Online. Brockwellenergy.com. [Accessed 21 Feb. 2020.]