Lancing Biomass Plant

From Wikiwaste
Revision as of 13:33, 17 April 2020 by MCWaste (talk | contribs)


Lancing Biomass Plant
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Enviropower Ltd
Capacity 5.1 MWe
Feedstock Waste Wood
EPR (Waste Licence) XP3030XX
ROC Yes
CfD
CHP No

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

A Biomass EfW facility based on consuming 40,000 tonnes per annum of mainly waste wood feedstock to produce 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste[1].

The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd[2].

Plant

The facility cost £10m to develop[1] and is collocated with recycling operations[2].

Local Authority Users

References