Margam Green Energy Plant
Magram Green Enegry Plant Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Margam Green Energy Ltd |
Capacity | 40 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | DP3137EG |
ROC | No |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW located near Port Talbot, South Wales, generating c. 40 MW[1].
The plant is owned by Glennmont Partners, a specialist clean energy investment fund whcih focuses on investment in claen energy infrastructure. Originally the Margam project was a joint venture between Cardiff based energy development company, Eco2 Ltd and a lcal company, Western Logs Group. Eco2 ltd now has responsibility for the plants overall operations adn fuel management supply[1].
The plant became operational in 2019 at a cost of c.£160m[1].
The Margam plant takes waste wood that is supplied by Stobart Biomass on a long term contract. The waste wood is sourced and supplied by Stobart from across the country at arate of approximately 6,000 tonnes per week (c. 300,000 tonnes per annum)[1].