Lancing EfW
Lancing EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | XP3030XX |
Operator | Enviropower Ltd |
Region | South East |
Operational Capacity | 75ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 5.00MWe |
Number of Lines | 2 |
Number of Turbines | 2 |
CHP | |
Technology Approach | EfW |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 59005.00 | 59005.00 |
2017 | 0.00 | 0.00 | 0.00 | 33280.00 | 33280.00 |
2018 | 0.00 | 0.00 | 0.00 | 57012.00 | 59629.00 |
2019 | 0.00 | 0.00 | 0.00 | 51537.00 | 55021.00 |
2020 | 0.00 | 0.00 | 0.00 | 60315.00 | 64056.00 |
2021 | 0.00 | 0.00 | 0.00 | 64666.00 | 66880.00 |
2022 | 0.00 | 0.00 | 0.00 | 52905.00 | 52905.00 |
2023 | 0.00 | 0.00 | 0.00 | 0.00 | 64158.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 6370.00 | 10.80% | 3580.00 | 6.07% |
2017 | 4601.00 | 13.83% | 1965.00 | 5.90% |
2018 | 12365.00 | 20.74% | 3442.00 | 5.77% |
2019 | 12941.00 | 23.52% | 4300.00 | 7.82% |
2020 | 11713.00 | 18.29% | 4551.00 | 7.10% |
2021 | 12262.00 | 18.33% | 3952.00 | 5.91% |
2022 | 4531.00 | 8.56% | 1823.00 | 3.45% |
2023 | 6248.00 | 9.74% | 2607.00 | 4.06% |
Summary
An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. Lancing has permitted operational capacity of 75,000 tonnes per annum, and is owned and operated by Enviropower Ltd, a subsidiary of Rabbit Group. Delivery of waste is from the adjacent Rabbit transfer station which prepares the Waste Derived Fuel for the plant comprising a Wood Waste /Biomass rich RDF and as a result is listed both within the Residual Waste EFW and Biomass Waste EFW listings.
History
The Rabbit facility was opened in 2008 to primarily service residual Wood Waste from skips and construction sources, with later expansion into a wider specification RDF produced in the adjacent transfer station and is reported as costing £15m[1].
Plant
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe for export to he national grid.
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|