Eye Power Station

From Wikiwaste
Revision as of 11:42, 8 August 2022 by Bin52 (talk | contribs) (add pic)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 53310 67470 0 1862 122642
2019 49580 82443 0 1998 134021
2020 38848 95463 0 1390 135701
2021 50627 78901 0 1301 130829
2022 44478 73441 0 1380 119299


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 3243 2.64% 3605 2.94%
2019 3829 2.86% 4380 3.27%
2020 4705 3.47% 6003 4.42%
2021 2824 2.16% 5948 4.55%
2022 3284 2.75% 4714 3.95%

Eye Power Station, picture from annual report, all rights reserved EPR
Eye Power Station, picture from annual report, all rights reserved EPR



Summary

Plant

Tonnage Input/Fuel

References