Slough Multifuel EFW
An EfW facility based upon conventional combustion technology that completed construction and handover in August 2024[1]. Slough Multifuel EFW was granted planning permission in 2017 and has a permitted capacity of 480,000 tonnes per annum.
Slough Multifuel EFW Under Construction | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | KP3702MY |
Operator | Scottish and Southern Energy |
Region | South East |
Operational Capacity | 480ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 49.90MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | [[]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology that completed construction and handover in August 2024. Slough Multifuel EFW was granted planning permission in 2017 and has a permitted capacity of 480,000 tonnes per annum. The site was purchased in 2008 by SSE and the project is being developed by a 50:50 joint venture between SEE Thermal and Copenhagen Infrastructure Partners (CIP)[2].
The plant is located on the Slough Trading Estate, close to the Slough Heat & Power facility, which is based on biomass feedstock.
Technology
The plant technology comprises standard moving grate technology, producing super-heated steam with an operational capacity of 545,000 tonnes per annum, generating 50MWe [3].
Construction
The plant gained planning permission in 2017, and was delivered by an EPC turnkey arrangement with Hitachi Zosen Inova technology. Construction was reported completed in August 2024[4].
Waste Input
The plant is intended to run on waste derived fuel from residual Household Waste and Commercial Waste, with around two thirds identified for long term contract.