R1 Recovery Facility

From Wikiwaste
Revision as of 11:28, 25 November 2019 by MCWaste (talk | contribs) (Added caption for image)

The R1 status of an Energy from Waste (EFW) facility determines whether that facility is regarded as Disposal or classifies it as an Energy Recovery Facility. The EU standard sets a requirement to meet high levels of power conversion efficiency to classify it as an R1 (and may need to be a CHP facility to fully meet the guidance).

To qualify as R1 status the EFW facility must :

Only R1 facilities can receive WDF from other EU countries for processing – export to other EU countries for Disposal (for example to an Incinerator that does not have R1 status) is illegal[2].

The formula for calculating the R1 status is given below:


File:R1 equation.png
Equation to calculate the R1 status for efficiency

[2]






References