Beddington EfW
Beddington EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | TP3836CT |
Operator | Viridor |
Region | London |
Operational Capacity | 347ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.88 |
Electrical Capacity | 26.00MWe |
Number of Lines | 2 |
Number of Turbines | 1 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 59801.00 | 20515.00 | 0.00 | 0.00 | 80316.00 |
2019 | 94447.00 | 57197.00 | 0.00 | 0.00 | 151644.00 |
2020 | 210137.00 | 114593.00 | 0.00 | 0.00 | 324730.00 |
2021 | 209382.00 | 115171.00 | 0.00 | 0.00 | 324553.00 |
2022 | 197023.00 | 136798.00 | 0.00 | 0.00 | 333821.00 |
2023 | 200430.00 | 130700.00 | 0.00 | 0.00 | 331130.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 0.00 | 0.00% | 0.00 | 0.00% |
2018 | 192.00 | 0.24% | 17.10 | 0.02% |
2019 | 36303.00 | 23.94% | 3169.00 | 2.09% |
2020 | 79308.00 | 24.42% | 5946.00 | 1.83% |
2021 | 77847.00 | 23.99% | 6163.00 | 1.90% |
2022 | 79058.00 | 23.68% | 5918.00 | 1.77% |
2023 | 74243.00 | 22.42% | 5726.00 | 1.73% |
Summary
An EfW facility based upon conventional combustion technology which as yet does not have R1 status. Beddington has permitted operational capacity of 303,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility processes primarily residual Household Waste and some Commercial Waste[1]
History
The Beddington facility was built primarily to service a 25 year PPP contract signed in November 2014 with the South London Waste Partnership comprising Croydon, Kingston, Merton, Richmond and Sutton receiving additional residual Commercial Waste. It is located in Sutton on Viridor's Landfill site which is due to close with the operation of the facility, which commenced in January 2020.
Plant
Built by CNIM and Lagan which started in 2015 and was delivered in January 2020 at a reported [2] £196m capital cost. The plant comprises 2 lines via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste.
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|---|
City of London | 18.570 |
Runnymede Borough Council | 386.080 |
Somerset Waste Partnership | 47.380 |
West Sussex County Council | 4430.910 |