Enviroparks Hirwaun Generation Site

From Wikiwaste
Revision as of 15:08, 17 February 2020 by Bin52 (talk | contribs) (Update links)
Cross section of EFW Plant from Planning Documents
Cross section of EFW Plant from Planning Documents


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology. Enviroparks envisaged a range of technologies on their 20 acre site, and started by building the first phase, an RDF production facility in June 2015. Other developments were delayed and a new planning application was submitted and approved in late 2017 for a revised EfW proposal. Zues Renewables have been an investment partner in the project[1].

Technology

The plant is a 3 line, grate based technology by Biomass Power Limited, generating steam to turbines delivering 86,724 MWe hours/year, or around 11MWe[2].

Construction

There is no information on the current status of funding or construction of the project in the public domain.

Waste Input

The plant is designed to run on 83,000 tonnes per annum of prepared RDF from offsite sources, and 155,0000 tonnes per annum of residual Household Waste and Commercial Waste prepared into an RDF in the adjacent fuel processing facility.

References