Hooton Bio Power

From Wikiwaste
Revision as of 07:29, 17 March 2021 by Bin52 (talk | contribs) (add pic)
Hooton Bio Power in Construction late 2021 - image from Cogen all rights reserved
Hooton Bio Power in Construction late 2021 - image from Cogen all rights reserved


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

Hooton Bio Power is an EfW facility currently under construction in Ellesmere Port, Cheshire. The facility will utilize Advanced Conversion Technologies to process 240,000 tonnes per annum and generate 25.2 MW of electricity which will be exported to the grid after the facility’s own power needs are met. The facility has been developed by CoGen with BWSC as the turnkey EPC contractor and O&M provider. In 2018, the facility was sold to Aviva Investors[1].

History

The project reached financial close in October 2018, with BWSC beginning construction in November 2018. Construction and commissioning is scheduled to end with operations commencing in the second half of 2021[2].

Plant

The facility will utilize 2 lines of a Fluidised Bed Gasification system provided by Kobelco Eco Solutions. CoGen will continue to be involved in the project’s delivery through long-term Management Service Agreements (MSA)[1].

The Hooton Bio Power facility will be the first non-subsidized merchant Gasification facility in the UK, and the largest Gasification facility in the UK of its size and technology type[3].

Waste Input

The waste aggregator N+P will supply the waste for the facility, providing locally-sourced waste under a 15-year feedstock supply agreement[1].