Kelvin Energy Recovery Facility
An EfW facility based upon conventional combustion technology that was acquired by Enfinium from Verus (Energy Oak Ltd) in 2021 and presently in construction, having reached financial close in November 2021. It has a forecast operational capacity of 395,000 tonnes per annum.[1].
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology that was acquired by Enfinium from Verus (Energy Oak Ltd) in 2021 and presently in construction, having reached financial close in November 2021. It has a forecast operational capacity of 395,000 tonnes per annum (with a permitted maximum of 400,000 tonnes per annum).
Technology
The plant technology will comprise a single line of a standard moving grate technology, processing around 45 tonnes per hour of waste and producing super-heated steam and 39MWe gross, with a net export of 34MWe[2]
Construction
The plant is being constructed under an EPC contract with Acciona.
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste and RDF with 50% secured through a long term supply agreement with Suez, with further announcments of supply from Biffa and B&M in October 2021[3].
References
- ↑ https://enfinium.co.uk/facilities/kelvin/
- ↑ Permit Introductory Note
- ↑ Cision PR Newswire