Tilbury Docks - Phase 2 (EfW)

From Wikiwaste
Revision as of 16:08, 22 September 2022 by Bin52 (talk | contribs)


Tilbury Docks - Phase 2 (EfW) is an EfW facility based upon conventional combustion technology that is the second phase of a development that also comprises a Biomass Waste EFW facility - listed on WikiWaste as Tilbury Green Power. This second phase of the site is anticipated to process 350,000 tonnes per annum of residual waste.


Tilbury Docks - Phase 2 (EfW)
Planning
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Tbc36
Operator Thameside Energy Recovery Facility Ltd
Region Eastern
Operational Capacity 350ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 36.40MWe
Number of Lines 0
Number of Turbines 0
CHP No
Technology Approach EfW
Funding Type [[]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Tilbury EFW Image, all rights reserved Viridor
Tilbury EFW Image, all rights reserved Viridor


Summary

The first phase of this site, the Tilbury Green Power plant, was developed by Tilbury Green Power Limited, the major shareholders at the time being the Electricity Supply Board (ESB) and the UK Green Investment Bank (GIB) (now called Green Investment Group) and in June 2021 the facility was acquired by two new shareholders - Altri SGPS S.A through its wholly owned subsidiary Greenvolt (51% of the shares) and Equitex (49% of the shares) for a value of £245.5m[1].

The original planning consent for the total site permitted the total capacity to be 60 MWe with an overall waste processing limit of 650,000 tonnes per year (part Wood Waste and part Solid Recovered Fuel. A variation to this planning consent was granted, which allows the site to operate up to 80 MWe and use up to 350,000 tonnes per annumSolid Recovered Fuel[2].

Tilbury Docks - Phase 2 (EfW) is an EfW facility based upon conventional combustion technology that is the second phase of a development. This second phase of the site is anticipated to process 350,000 tonnes per annum of residual waste.

In September 2022 it was announced that Viridor had acquired Thameside Energy Recovery Facility Ltd from ESB, which owns the right to develop, construct and operate the Tilbury Docks - Phase 2 (EfW)[3].


Technology

The plant technology will comprise standard moving grate technology.

Construction

The stated intention is for the plant to be operational by 2026. No further announcements have been made to date.

Waste Input

The plant is intended to run on Solid Recovered Fuel but it is expected that this might be broadened out to residual Household Waste and Commercial Waste.

References