Nationally Significant Infrastructure Projects

From Wikiwaste
Revision as of 12:29, 28 November 2019 by MCWaste (talk | contribs) (Fixed link)

Nationally Significant Infrastructure Projects (NSIPs) are large scale developments (relating to energy, transport, water, or waste) which require a type of consent known as “development consent”. The Planning Act 2008 introduced a new development consent process for NSIPs which was subsequently amended by the Localism Act 2011. A Development Consent Order (DCO) automatically removes the need to obtain several separate consents, including Planning Permission and is designed to be a much quicker process than applying for these separately. An extension of the regime in 2013 now allows certain business and commercial projects to opt into this process [1].

References

  1. House of Commons, 2019. [https://researchbriefings.files.parliament.uk/documents/SN06881/SN06881.pdf Planning for Nationally Significant Infrastructure Projects Briefing Paper Number 06881, 17 July 2017.