Beddington EfW

From Wikiwaste
Revision as of 08:01, 4 February 2020 by Bin52 (talk | contribs) (add page specific text)
Viridor Beddington
Viridor Beddington


Beddington EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence TP3836CT
Operator Viridor
Region London
Operational Capacity 347ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.88
Electrical Capacity 26.00MWe
Number of Lines 2
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 59801.00 20515.00 0.00 0.00 80316.00
2019 94447.00 57197.00 0.00 0.00 151644.00
2020 210137.00 114593.00 0.00 0.00 324730.00
2021 209382.00 115171.00 0.00 0.00 324553.00
2022 197023.00 136798.00 0.00 0.00 333821.00
2023 200430.00 130700.00 0.00 0.00 331130.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 192.00 0.24% 17.10 0.02%
2019 36303.00 23.94% 3169.00 2.09%
2020 79308.00 24.42% 5946.00 1.83%
2021 77847.00 23.99% 6163.00 1.90%
2022 79058.00 23.68% 5918.00 1.77%
2023 74243.00 22.42% 5726.00 1.73%

Summary

An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. Trident Park has permitted operational capacity of 425,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and and the facility processes primarily residual Household Waste and some Commercial Waste[1]

History

The Trident Park facility was built primarily to service a 25 year PPP contract signed in December 2013 by Cardiff City Council on behalf of the Prosiect Gwyrdd (Project Green) partnership of five local authorities in South Wales ( Cardiff, Newport, Monmouthshire, Vale of Glamorgan and Caerphilly, with anticipated input of 172,000 tonnes per annum of the total design capacity of 350,000 tonnes per annum - receiving additional residual Commercial Waste. It is located in Cardiff bay and has been operational since 2014.

Plant

Built by CNIM and Lagan which started in Spring 2012 and was delivered in 2014 at a reported [2] £206m capital cost. The plant comprises 2 lines via standard combustion technology Martin reverse acting grate, generating super-heated steam, and is configured to run on primarily residual Household Waste and similar residual Commercial Waste.

Local Authority Users

References