Tansterne
Tansterne Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Solar 21 |
Capacity | 22 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | WP3738DE |
ROC | Yes |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility located in Tansterne near Hull which is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid[1].
It was funded and developed by Irish renerwable energy company Solar 21 in partnership with Heat Recovery Solutions (HRS) Ltd[2]. The plant became fully operational in February 2018. The cost of the project was an estimated £35m[3].
In 2016 Probio Energy International won the contract to be sole supplier of the waste wood to the facility[4].
Plant
The biomass power plant utilises a twin line fluidised bed gasification combustion system, heat recovery and power module technology developed by HRS, a subsidiary HRS Energy Ltd which was manufactured in Hull by project partner CF Struthers, the sister company to HRS Energy[5]. Each line has a maximum throughput in the order of 16 tonnes per hour[6].
In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility[1].
The plant has been built to be 'CHP ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achieveable without any modification to the installed system[7].