Tansterne

From Wikiwaste
Revision as of 10:23, 9 April 2020 by Northern Chick (talk | contribs) (→‎Plant: Additional text.)


Tansterne
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Solar 21
Capacity 22 MWe
Feedstock Waste Wood
EPR (Waste Licence) WP3738DE
ROC Yes
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Tansterne
Tansterne


Summary

A Biomass Waste EFW facility located in Tansterne near Hull which is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid[1].

It was funded and developed by Irish renerwable energy company Solar 21 in partnership with Heat Recovery Solutions (HRS) Ltd[2]. The plant became fully operational in February 2018. The cost of the project was an estimated £35m[3].

In 2016 Probio Energy International won the contract to be sole supplier of the waste wood to the facility[4].

Plant

The biomass power plant utilises a twin line fluidised bed gasification combustion system, heat recovery and power module technology developed by HRS, a subsidiary HRS Energy Ltd which was manufactured in Hull by project partner CF Struthers, the sister company to HRS Energy[5]. Each line has a maximum throughput in the order of 16 tonnes per hour[6].

In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility[1].

The plant has been built to be 'CHP ready' so that when a district heating market becomes available, the provision of heat to supply a local network will be achieveable without any modification to the installed system[7].

Refernces