Medworth EFW CHP
An EfW facility based upon conventional combustion technology, Medworth EFW CHP has permitted operational capacity of 625,600 tonnes per annum and commenced construction in February 2025[1]. It is located in Algores Way, Wisbech .
| Medworth EFW CHP Planning | |
See Residual EfW → page for a larger UK Wide map. | |
| Waste Licence | HP3441QA |
| Operator | MVV Environment |
| Region | Eastern |
| Operational Capacity | 626ktpa |
| Is site R1? | fal |
| When was R1 Granted? | |
| What was the R1 value | 0.00 |
| Electrical Capacity | 50.00MWe |
| Number of Lines | 2 |
| Number of Turbines | 0 |
| CHP | Yes |
| Technology Approach | EfW |
| Funding Type | [[]] |
Operators Annual Report
Input Data
| Year | HH | C&I | Clin | RDF | Total |
|---|
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|

Summary
An EfW facility based upon conventional combustion technology, Medworth EFW CHP has permitted operational capacity of 625,600 tonnes per annum and commenced construction in February 2025[1]. It is located in Algores Way, Wisbech.
Technology
The plant is to be delivered by Hitachi Zosen Inova under a Design & Build EPC-turnkey contract using standard combustion technology[2].
Construction
The plant commenced construction in February 2025 with operation due to commence 3 years time[1].
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste.
