Allington EFW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence BR4551IC
Operator Kent Enviropower (FCC Environment)
Region South East
Operational Capacity 560ktpa
Is site R1? fal
When was R1 Granted? 2019-03-04
What was the R1 value 0.54
Electrical Capacity 37.70MWe
Number of Lines 3
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 330381.00 183073.00 0.00 0.00 533037.00
2017 326220.00 157761.00 0.00 0.00 504106.00
2018 513098.50 0.00 0.00 0.00 534355.66
2019 311438.00 191554.00 0.00 0.00 527825.00
2020 312625.00 116720.00 0.00 0.00 466657.00
2021 343579.00 128936.00 0.00 0.00 501352.00
2022 313000.00 180494.00 0.00 0.00 520060.00
2023 329753.00 155784.00 0.00 0.00 511421.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 56337.50 10.57% 51932.64 9.74%
2017 51289.44 10.17% 46355.00 9.20%
2018 51916.12 9.72% 48151.02 9.01%
2019 52253.00 9.90% 46624.00 8.83%
2020 46848.00 10.04% 38284.00 8.20%
2021 51378.00 10.25% 38848.00 7.75%
2022 47270.00 9.09% 44852.00 8.62%
2023 46570.00 9.11% 43171.00 8.44%

Summary

History

Plant

Local Authority Users