Edmonton EcoPark EfW

From Wikiwaste
Revision as of 13:39, 7 February 2020 by Bin52 (talk | contribs) (add picture and link)
Edmonton EcoPark EFW
Edmonton EcoPark EFW

<ref>


Edmonton EcoPark EfW
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence YP3033BE
Operator Londonenergy
Region London
Operational Capacity 750ktpa
Is site R1? fal
When was R1 Granted? 2016-05-12
What was the R1 value 0.80
Electrical Capacity 40.00MWe
Number of Lines 5
Number of Turbines 4
CHP Yes
Technology Approach EfW
Funding Type PPP

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 547057.00 0.00 664.00 0.00 547721.00
2017 511266.00 0.00 664.00 0.00 511930.00
2018 510831.00 0.00 470.00 0.00 518040.00
2019 486573.00 0.00 458.00 1597.00 498165.00
2020 479262.00 0.00 460.00 60664.00 541976.00
2021 498431.00 0.00 544.00 16752.00 515761.00
2022 475425.00 0.00 521.00 12746.00 488731.00
2023 235070.00 0.00 302.00 0.00 483917.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 117330.00 21.42% 18243.00 3.33%
2017 91596.00 17.89% 17379.00 3.39%
2018 92842.00 17.92% 17210.00 3.32%
2019 24006.00 4.82% 4163.00 0.84%
2020 67396.00 12.44% 16759.00 3.09%
2021 82526.00 16.00% 15386.00 2.98%
2022 80612.00 16.49% 13763.00 2.82%
2023 86389.00 17.85% 11210.00 2.32%

Summary

History

Plant

Local Authority Users

References