Earls Gate Energy Centre

Revision as of 12:25, 21 February 2020 by MCWaste (talk | contribs)

[1]

Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.
Earls Gate Energy Centre. Biothek Ecologic Fuel, 2018.


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN



Summary

An EfW facility based upon conventional combustion technology, located at Earls Gate Park, Grangemouth in Scotland. The facility is forecasted to have a maximum capacity of 215,000 tonnes per annum, and will be a Combined Heat and Power facility, exporting 21.5 MW electricity and heat to the nearby chemical company CalaChem and to other adjacent industrial plants, with any excess power fed into the national grid. The cost of the project is circa £200m, which was provided by the investors Brockwell Energy, the Green Investment Group and Covanta. The facility has been developed by Brockwell Energy, and will be operated by MES Environmental, a subsidiary of CNIM, for a contract duration of 25 years.

The EfW will replace an existing gas-fired energy plant on the site.

It is expected for the facility to become operational by the end of 2021[2].

Technology

The moving-grate combustion technology will be provided by CNIM[3].

Construction

CNIM is the EPC contractor for this facility, with Clugston in charge of the civil engineering. Construction commenced in January 2019 and is scheduled to take 3 years, with commissioning ending and operations beginning in 2021[2].

Waste Input

The facility will accept residual waste as feedstock.