Charlton Lane Eco Park (ACT)

Revision as of 13:22, 25 February 2020 by Northern Chick (talk | contribs) (→‎Summary: typo)
Suez Picture of Charlton Lane Site
Suez Picture of Charlton Lane Site


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology with AD, a MRF bulking facility and an HWRC on the same site. The Charlton Lane site (also known as Surrey Eco Park) has forecast operational capacity of 60,000 tonnes per annum for the Gasification alone (with around 40,000 tonnes per annum in the AD plant). It was reported that the first waste for hot commissioning was accepted in late 2019 with the Gasification facility now entering final stages of commissioning[1].

Technology

The plant is a single line, fluidised bed Gasification plant by Outotec, generating super-heated steam.

Construction

The plant commenced construction in summer 2015 under a turnkey EPC contract with MW High Tech Projects UK. The current EfW plant is not reported as fully commissioned as yet.

Waste Input

The plant is designed to run on residual Household Waste under a PFI contract with Surrey and some residual Commercial Waste.

References