Barry Dock – Biomass No 2

Revision as of 14:31, 3 April 2020 by MCWaste (talk | contribs) (Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=Barry|id=10}} 400px|left|Barry Biomass EfW. Lets Recycle, 2020. ==Summary== A Biomass Waste...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Barry Biomass EfW. Lets Recycle, 2020.
Barry Biomass EfW. Lets Recycle, 2020.



Summary

A Biomass Waste EFW facility based on 86,000 tonnes per annum of Wood Waste generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. The waste wood feedstock consumed at this facility comes from a variety of sources including municipal recycling centres and manufacturing companies[1].

Construction of this facility began in 2016 and entered the commissioning stage in 2019, becoming fully operational in 2020[1].

Operations are carried out by Barry Biomass, which is fully monitored by Natural Resources Wales (NRW)[2].

Plant

The facility is owned by an investment fund managed and financed by Aviva Investors[2]

Gasification technology is implemented to recover energy[2].

Local Authority Users

References