Trackwork Waste and Thermal Treatment Facility

Picture of Trackwork Biomass EFW site, source Google Streetview
Picture of Trackwork Biomass EFW site, source Google Streetview


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN




Summary

A Biomass Waste EFW facility permitted to incinerate up to 35,000 tonnes per annum of Wood Waste generating 3.0MWe to the grid.

The Trackwork site was developed by Trackwork Ltd to process used railway sleepers from the rail network. Due to the hazardous nature of this particular material, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled.

Plant

The plant has expanded to take a wider range of hazardous Wood Waste beyond the originally intended railway sleepers[1], including other treated Wood Waste:

  • Creosote wood waste
  • Copper Chromium Arsenic (CCA) wood waste
  • Tanalised wood waste
  • Cooling tower wood waste
  • Demolition wood waste
  • Marine timber waste
  • Utility poles
  • Telegraph poles

Local Authority Users

The plant utilizes hazardous Wood Waste from the rail network and other commercial and industrial sources and receives no local authority wood.