Chilton Power Station

Revision as of 08:37, 7 April 2020 by MCWaste (talk | contribs) (Changed picture)


[1]

Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Chilton Biomass EfW. Geograph, 2011.
Chilton Biomass EfW. Geograph, 2011.






Summary

A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of Wood Waste to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. The wood feedstock consists of old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from civic amenity sites[2].

The facility has been developed, built and continues to be operated by Dalkias, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011[2].

Plant

The facility cost £40 million to develop[2].


Local Authority Users

References