Goosey Lodge Power Plant

Revision as of 20:09, 8 April 2020 by Northern Chick (talk | contribs) (→‎Plant: typo)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

Plant

Goosey Lodge biomass facility utilises a fluidised bed combustor system which ensures that any liquids and sludges with high Biological or Chemical Oxygen Demands (BOD and COD respectively) can be oxidised efficiently[1].

Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company. Wkes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management[1].

References