Plymouth Timber Resource Recovery Plant

Revision as of 06:27, 27 April 2020 by Bin52 (talk | contribs) (tonnage data added)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Dartmoor Biomass EfW. CoGen, 2018.
Dartmoor Biomass EfW. CoGen, 2018.


Summary

A Biomass EfW facility based on up to 36,000 tonnes per annum of Wood Waste producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the Wood Waste feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business[1].

The facility was developed by CoGen who continues to provide management services[1].

Until 2019, the facilities operator was Zebec.

Plant

The facility utilises Nexterra’s gasification system technology, which is an Advanced Conversion Technology[1].

Tonnage Input/Fuel

There is no tonnage reported as received by the plant in the most recent Annual Sustainability Report for 2018-19[2].

The Wood Waste tonnage received in the EA statistics on a calendar year basis (i.e. January 2018 to December 2018) was 10,556 tonnes.

References