Wilton 10
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Sembcorp Utilities (UK) Ltd
Capacity 35.2 MWe
Feedstock Waste Wood/Virgin
EPR (Waste Licence) NP3838LV
ROC Yes
CfD
CHP Yes

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Brigg Biomass EFW - source cipartners.dk
Brigg Biomass EFW - source cipartners.dk


Summary

A Biomass Waste EFW facility based upon the co-firing of Wood Waste, virgin wood, forestry processing rejects and energy crops to generate 30MWe and 10MWth of energy for use in the grid and the adjacent Sembcorp site, as an ancillary operation to their 197MW Wilton Power Station[1]. The plant consumes up to 300,000 tonnes per year of material, of which around 80,000 tonnes is Wood Waste supplied by UK Waste Wood Recycling, a subsidiary of Enva, from a nearby separate site.

The Wilton 10 facility was developed by Sembcorp Energy UK and was operational in the autumn of 2007 and at the time was the first large scale biomass power station to be built. It is located in Teeside on the Wilton International Industrial Estate and is discrete from Wilton 11 which is a Residual Waste EFW project.

Plant

Built under an EPC contract with Foster wheeler for a reported $55m (excluding the turbine and power island supplied by Siemens), the standard combustion technology is based on a fluidised bed system.

Tonnage Input/Fuel

The tonnage received by the plant is a mixture of Biomass and in the most recent Annual Sustainability Report for 2018-19[2] Ofgem reported the following fuel received (Wood Waste representing 8% of input):

Biomass Tonnage (2018-19)
Wood Waste 15,239
Straw 132,339
Miscanthus 23,755
Sawmill Residues 2,308
Arboriculture and Forestry Residues 19,638
Short Rotation Coppice 3,835
Other (Olive Pellets) 4,968
Total 202,082

The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and no figures were available for the period.

References