Brigg REP
| Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
| Operator | Error: no local variable "operator" has been set. |
| Capacity | Error: no local variable "capacity" has been set. MWe |
| Feedstock | Error: no local variable "mainfeed" has been set. |
| EPR (Waste Licence) | Error: no local variable "epr" has been set. |
| ROC | Error: no local variable "roc" has been set. |
| CfD | Error: no local variable "cfdcap" has been set. |
| CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
| Year | Wood | Litter | RDF | Other | Total |
|---|
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|

Summary
A Biomass Waste EFW facility processing up to 250,000 tonnes per year of a range of Biomass, but primarily straw and a limited amount of Wood Waste to generate up to 40MWe for export to the national grid[2]. The straw fuel is supplied under a 12 year agreement with Worldwide Farming Partnership (WFP) as well as other local and regional farmers.
The plant is jointly owned by Burmeister & Wain Scandinavian Contractor A/S (BWSC) and Copenhagen Infrastructure Partners K/S (CIP), with senior debt refinancing completed in 2017 of £250m (including Royal Bank of Scotland, Investec, Aviva Investors and others).
Plant
Built under an EPC contract with Burmeister & Wain Scandinavian Contractor A/S (BWSC), construction commenced in early 2014 and commissioning and first power was delivered at the end of 2015 and formal opening in January 2016.
Tonnage Input/Fuel
The tonnage received by the plant is a mixture of Biomass and in the most recent Annual Sustainability Report for 2018-19[3] Ofgem reported the following fuel received (Wood Waste representing 8% of input):
| Biomass | Tonnage (2018-19) |
|---|---|
| Wood Waste | 15,239 |
| Straw | 132,339 |
| Miscanthus | 23,755 |
| Sawmill Residues | 2,308 |
| Arboriculture and Forestry Residues | 19,638 |
| Short Rotation Coppice | 3,835 |
| Other (Olive Pellets) | 4,968 |
| Total | 202,082 |
The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) although no waste tonnage was recorded by the site in the waste returns.
References
- ↑ Brigg Biomass EfW Site PhotoAll Rights Reserved
- ↑ Brigg website
- ↑ Biomass Sustainability Dataset 2018-19
