Tunstead Cement Kiln
Error: no local variable "site" has been set. | |
See Cement Kilns → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "company" has been set.]] |
Parent Company | [[Error: no local variable "parent" has been set.]] |
Clinker Capacity | Error: no local variable "clinker" has been set. Mt |
Summary site information collated from a variety of sources.
Overview
WikiWaste has used the website Cement Plants and Kilns in Britain and Ireland[1] extensively for the reference material for each individual cement kiln page. The detail on this reference website is extensive and as WikiWaste is focused upon the UK waste and resource market, only the key highlights are captured from this website (and company websites accordingly) to provide background and context. Tunstead started manufacturing clinker in 1966 and up to 2015 had produced 17.3 million tonnes of clinker through 2 rotary kilns over this period. Tunstead is also the largest UK site for the supply of lime and lime-based products, which has been undertaken since 1929[2].
Ownership
The Process at Tunstead
The process at the site is similar to that at Cauldon - a 'dry process' from kiln supplier FLS (FLSmidth).
Raw Materials
The primary raw materials are Carboniferous Limestone. Tunstead Quarry and Old Moor Quarry service the site.
Waste Used on Site
There is no waste return for the Tunstead site to the EA available for the most recent year, but the Tarmac website talks about using alternative fuels to substitute over 50% of its energy needs with a long term target of 70% focused on tyres and solvents/liquid fuels[3] and is documented as receiving MBM from 2013 in the Cement Plants and Kilns in Britain and Ireland.